Solar and Storage for Critical Facilities
What you will be able to do
Planned for this course. The final list is confirmed by our subject matter experts before the course opens.
- Understand What the Facility Must Keep Running Identify critical loads, interruption limits, backup duration needs, and what happens when power is lost.
- See How the Power Systems Work Together Connect the roles of utility power, solar, batteries, generators, UPS, transfer equipment, and controls in a documented facility design.
- Walk Through Normal and Outage Operation Examine how the facility is intended to operate, respond to an outage, and recover, including dependencies that could prevent those modes.
- Recognize Weak Points in the Design Identify missing evidence, shared dependencies, and operating limitations that could affect reliability or resilience.
- Plan What Commissioning Must Demonstrate Turn facility requirements into proposed checks, acceptance criteria, and questions for qualified engineering and commissioning teams.
- Prepare a Clear Operations Handoff Identify who owns each system, what records and monitoring are needed, and how open issues should be passed to the operating team.
Course team
Lee Vernon
Subject matter expert
Solar commissioning · Co-Owner of RE:BOOT
With 33+ years in the electrical field and 20 years in solar, Lee has extensive experience in utility-scale PV commissioning, maintenance, and troubleshooting. His work spans field leadership, inverter technical support, and root-cause analysis, helping teams diagnose problems and improve solar asset reliability.
Darin Hadinger
Course collaborator
Solar commissioning · Founder of RE:BOOT
With 13+ years in renewable energy, Darin Hadinger has taught solar, wind, and microgrid courses and led workforce training for veterans and people returning from incarceration. His experience also spans commercial solar development, financing, and building RE: and its field services arm, RE Operations.
Devyn Pizzo
Course developer
Founder & CEO · ASCEND Education Group
Course outline
1. Understanding the Power Needs of Critical Facilities
Not every electrical load has the same importance, especially in facilities where an interruption can affect safety, operations, or essential services. This section explores how critical loads are identified, how operating requirements are established, and why backup duration and acceptable interruptions matter. You'll learn how these requirements influence decisions about power-system architecture, equipment integration, and facility resilience.
2. Understanding How Power Systems Work Together
Critical facilities may rely on several interconnected sources of power, including the utility grid, solar PV, battery storage, generators, and uninterruptible power supplies (UPS). Explore how these systems connect through electrical distribution equipment, transfer systems, and controls. You'll learn to recognize where responsibilities and system boundaries meet and why the capabilities of individual components don't always guarantee the performance of the complete system.
3. Understanding Operating Modes and Backup Power
A facility's electrical system may behave differently during normal operation, a utility outage, maintenance, or recovery from a disturbance. This section examines how power sources and control systems are intended to respond under different operating conditions. You'll explore backup operation, transfer requirements, and islanding capabilities where they are part of the approved design, while learning to distinguish documented system capabilities from assumptions.
4. Recognizing Dependencies and Potential Failures
Reliable operation depends on more than having enough generation or battery capacity. Auxiliary power, communication networks, controls, equipment availability, and load priorities can all influence how a facility responds to a problem. You'll examine scenarios involving system dependencies and potential failures to understand how an issue in one area can affect other equipment or critical operations.
5. Planning and Evaluating Integrated Commissioning
Testing individual pieces of equipment does not necessarily prove that the complete facility power system will operate as intended. Explore how integrated commissioning evaluates the relationships between power sources, controls, transfer equipment, and facility loads. You'll learn how to connect operating requirements to proposed test conditions, acceptance criteria, responsible parties, and the evidence needed for qualified personnel to evaluate system performance.
6. Preparing for Operations and Long-Term Reliability
A system may perform as expected during commissioning but still require clear operating procedures, maintenance responsibilities, and reliable communication between teams. This section explores the documentation, monitoring, escalation procedures, and handoffs needed to support ongoing facility operations. The proposed capstone brings together facility requirements, integrated electrical systems, operating modes, and commissioning decisions to examine whether a system's stated resilience objectives are supported by the available design and operating evidence.