Commissioning Evidence That Holds Up
What you will be able to do
Planned for this course. The final list is confirmed by our subject matter experts before the course opens.
- Know What Needs to Be Proven Connect project requirements to the tests and records needed before equipment or systems can be accepted.
- Spot What Is Missing Before Testing Review readiness documents, equipment conditions, and test prerequisites to identify what must be resolved first.
- Tell a Valid Test from a Weak One Check whether the method, instrument, conditions, and recorded results support the conclusion being claimed.
- Check System Functions and Interfaces Review evidence that equipment, alarms, monitoring, and controls behaved as required during commissioning.
- Close Out Issues with Evidence Track failed tests, corrections, retests, and open items so the appropriate authority can make an informed acceptance decision.
Course team
Lee Vernon
Subject matter expert
Solar commissioning · Co-Owner of RE:BOOT
With 33+ years in the electrical field and 20 years in solar, Lee has extensive experience in utility-scale PV commissioning, maintenance, and troubleshooting. His work spans field leadership, inverter technical support, and root-cause analysis, helping teams diagnose problems and improve solar asset reliability.
Darin Hadinger
Course collaborator
Solar commissioning · Founder of RE:BOOT
With 13+ years in renewable energy, Darin Hadinger has taught solar, wind, and microgrid courses and led workforce training for veterans and people returning from incarceration. His experience also spans commercial solar development, financing, and building RE: and its field services arm, RE Operations.
Devyn Pizzo
Course developer
Founder & CEO · ASCEND Education Group
Course outline
1. Understanding What Commissioning Must Prove
Commissioning is more than checking boxes on a test sheet. Before testing begins, it's important to understand what the system is expected to do and what evidence is needed to show that it meets those requirements. This section covers how to work with project specifications, equipment documentation, and acceptance criteria to establish what needs to be verified.
2. Preparing for Commissioning
A test is only useful when the equipment, documentation, and site conditions are ready for it. Explore the checks that should happen before commissioning, including equipment readiness, current drawings, instrument requirements, and applicable safety procedures. You'll work through examples of missing or incomplete prerequisites and learn why they matter to the validity of the test.
3. Understanding Valid Test Results
A recorded result doesn't necessarily mean a system has passed. Learn how measurement methods, instrument accuracy, test conditions, and documentation affect whether a result can be trusted. You'll examine examples of incomplete or misleading test records and determine what additional evidence is needed before accepting the findings.
4. Checking System Functions and Communication
Electrical equipment must do more than simply turn on. This section explores how commissioning verifies system functions, equipment communication, monitoring points, alarms, and control interfaces against documented requirements. You'll learn what a functional test should demonstrate and how to recognize when a successful startup doesn't prove the entire system is operating as intended.
5. Evaluating Performance and Capacity
A system may operate correctly while still failing to meet its expected performance. Explore how performance and capacity testing differs from basic functional verification, including the importance of operating conditions, measurement boundaries, and comparison baselines. You'll review examples of test results and determine whether the available evidence supports the stated performance claims.
6. Resolving Issues and Completing the Handoff
Commissioning doesn't end when the testing is finished. Learn how to document failed tests, track corrective work, verify retesting, and identify issues that remain unresolved. The course concludes with a commissioning package review where you'll evaluate the supporting evidence and recommend whether acceptance should proceed or additional verification is needed, subject to the appropriate approval authority.